Floor Refinishing Service. Hardwood Floor Sanding & Installation

Looking to Refinish Your Floors?

Expert Tips for Controlling Humidity and Temperature During Floor Finishing

Expert Tips for Controlling Humidity and Temperature During Floor Finishing

Are you planning to refinish your floors? If so, you probably know that controlling humidity and temperature is crucial for achieving a flawless finish. Whether you are a DIY enthusiast or a professional contractor, this blog post is for you. We will be sharing expert tips and techniques to help you maintain optimal humidity and temperature levels during floor finishing. By following these recommendations, you can ensure a successful and long-lasting result. So, if you’re ready to elevate your floor refinishing game, keep reading!

Humidity Control: The Specifics

HUMIDITY CONTROL

Navigating the complexities of applying a water-based finish in the summer heat involves careful management of humidity and temperature. Let’s delve deeper into how you can ensure a flawless finish by controlling these environmental variables effectively.

Optimal Humidity Levels

Aim to maintain indoor humidity levels between 40-60% during the floor finishing process. This range is ideal for promoting proper drying and curing of the finish.

Monitoring and Adjusting to Humidity

To keep an eye on the humidity, use a reliable hygrometer. If the humidity is above the optimal range (over 60%), a dehumidifier can help reduce it, preventing slow drying and potential graying or cloudiness in the finish. If the air is too dry (below 40%), a humidifier can add moisture to prevent the finish from drying too quickly and becoming brittle.

Adjusting Application in High or Low Humidity

If you cannot alter the humidity to the desired level, adjust the drying times accordingly. High humidity means waiting longer between coats, while low humidity could mean the finish will dry too rapidly, potentially causing issues with adhesion or finish integrity.

Temperature and Its Effects on Water-Based Finishes

Temperature and Its Effects on Water-Based Finishes

Pre-application Temperature Setup

Before starting your finish work, pre-cool the space with your AC to create a stable temperature, then turn it off during application to prevent rapid drying and potential bubble formation.

After Application: The Correct Approach

After applying a coat of finish, it’s essential to wait until it’s fully dried before considering another coat. During this drying period, turning the AC back on can help maintain a consistent temperature and assist in the evaporation process. However, it’s crucial to ensure that the AC isn’t causing direct airflow onto the surface, which can introduce dust or cause uneven drying. Also, it is very important to vacuum very well deep inside the vents, before applying as turning the AC back on will shoot the dust in the air and will let it settle on the wet finish.

Timing Between Coats of Finish

Timing Between Coats of Finish

When to Apply the Next Coat

A new coat should only be applied once the previous one is thoroughly dry. This is non-negotiable in floor finishing as applying a coat over a wet base can lead to peeling, clouding, or other finish failures. For water-based finish drying time is usually 1-2 hours, in normal conditions, for oil-based finish is usually a minimum of 8 hours.

Signs That Your Floor is Ready for Another Coat

Look for a uniform matte appearance and a non-tacky feel to the touch. On humid days, be prepared to extend the drying time. Rushing the process could lead to moisture being trapped between layers, weakening the overall finish and causing aesthetic issues.

By adhering to these guidelines, you can apply a water-based finish that achieves professional durability and beauty, even in the challenging conditions of summer. It’s about precision and patience, ensuring that the environment is as meticulously prepared as the wood itself.

Floor Refinishing Service. Hardwood Floor Sanding & Installation